2007

 

Refereed Journals

 

1.     Ai, The Jin, and Kachitvichyanukul, V., “A Particle Swarm Optimization for the Capacitated Vehicle Routing Problem,” International Journal of Logistic and SCM Systems, Vol. 2, No. 1, 2007, pp.50-55

 

2.     Pongchairerks, P. and Kachitvichyanukul, V., “A Comparison between Algorithms VNS with PSO and VNS without PSO for Job-shop Scheduling Problems,” International Journal of Computational Science, Vol.1, No. 2, 2007, pp.179-191

 

3.     Sirikum, J., Techanitisawad, A. and Kachitvichyanukul, V., “A New Efficient GA-Benders Decomposition Method: for Power Generation Expansion Planning with Emission Controls,” IEEE Trans. on Power Systems, Vol.22, No. 3, 2007, pp. 1092-1100

 

4.      Tang, T.D., Bohez, E.L.J., and Koomsap, P., “The sweep plane algorithm for global collision detection with workpiece geometry update for five-axis NC machining,” Computer-Aided Design, Vol. 39 No. 11 2007, pp.1012-1024

 

5.     Campanelli, S.L., Cardano, G., Giannoccaro, R., Ludovico, A.D., Bohez, E.L.J., “Statistical Analysis of the Stereolithographic Process to Improve the Accuracy,” Computer-Aided Design, Vol. 39, No. 1, 2007, pp.80-86

 

6.     Bohez, Erik L.J., Ariyajunya, B., Sinlapeecheewa, C., Shein, T.M.M., Lap, D.T., and Belforte, G. “Systematic Geometric Rigid Body Error Identification of 5-axis Milling Machines,” Computer-Aided Design, Vol. 39, No. 4, 2007, pp.229-244

 

7.     Pisuchpen R., Bohez E.L.J., and Janssens G.K., “Modeling and Optimization of Integrated of JIT Flexible Manufacturing, Assembly and

Disassembly by Petri Nets,” Journal of Research in Engineering and Technology, Vol. 4, No. 3, 2007, pp 221-255.

 

8.     Nilrangsee, P. & Bohez, E. L.J., “Optimal Electric Energy Subscription Policy for Multiple Plants with Uncertain Demand,”  Industrial Engineering and Management Systems (IEMS), Vol.6, No.2, 2007, pp.106-118

 

9.     Luong, H.T., “Measure of Bullwhip Effect in Supply Chain with Autoregressive Demand Process,”  European Journal of Operational Research Vol. 180 (3), 2007 pp. 1086-1097

 

10.  Luong, H.T. and Phien, N.H., “Measure of Bullwhip Effect in Supply Chain: The Case of High Order Autoregressive Process,”  European Journal of Operational Research, Vol. 183(1), 2007, pp.197-209

 

 

Conference Proceedings

 

1.     Udomsakdigool, A. and Kachitvichyanukul, V., “Applying Forward/Backward Scheduling to Multi-Colony Ant Algorithm in Solving Scheduling Problem,” IAENG International Conference on Industrial Engineering (ICINDE'07), Hong Kong, March 2007

 

2.     Ai, The Jin, and Kachitvichyanukul, V., “A Particle Swarm Optimization for the Capacitated Vehicle Routing Problem,” the International Congress on Logistic and Systems, Yokohama, Japan, August 2007

 

3.     Ai, The Jin, and Kachitvichyanukul, V., “Dispersion and Velocity Indices for Observing Dynamic Behavior of Particle Swarm Optimization,” IEEE Congress on Evolutionary Computation, Singapore, September 2007

 

4.     Kasemset, C. and Kachitvichyanukul, V., “Simulation-based Procedure for Bottleneck Identification,” the ASIASIM 2007 Conference, Seoul, Korea, October, 2007.

 

5.     Trinh, T. H. and Kachitvichyanukul, V., “Event Graph Models for Generic Manufacturing Systems with Push and Pull Policies,” the ASIASIM 2007 Conference, Seoul, Korea, October, 2007.

 

6.     Ai, The Jin, and Kachitvichyanukul, V., “A Particle Swarm Optimization for the Vehicle Routing Problem with Clustered Customers,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

7.     Pratchayaborirak, T., and Kachitvichyanukul, V., “A Two-Stage Particle Swarm Optimization for Multi-Objective Job Shop Scheduling Problems,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

8.     Truong, V.X., and Kachitvichyanukul, V., “A Hybrid PSO Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problems,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

9.     Vu, X.T. & Kachitvichyanukul, V., “A Hybrid PSO Algorithm for Multi-Mode Resource-Constrained Project Scheduling Problems,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

10.  Lin, T., Lee, J.-W., Bohez, E.L.J., Makhanov, S.S., Munar, A.C., and Singh, M., “CAM for NC Machining of 5-axis Free-form Surfaces,” Proceeding of the 2007 International CAD Conference CAD07 and Exhibition, Honolulu, Hawaii, June 2007

 

11.  Sukromsai, S. Wannarumol, S., and Bohez, E. L.J., “A New 5-Axis Haptic Jewelry Design and Manufacturing system Concept,” Proceeding of the 19th International Conference of Production Research (ICPR19), Chili, July 2007

 

12.  Singh, M., Bohez, E.L.J., Munar, A.C., Lin, T., and Makhanov, S.S., “5-Axis Computer Aided Manufacturing of Stamping Die Insert: A Case Study,” Proceeding of the 19th International Conference of Production Research (ICPR19), Chili, July 2007

 

13.  Munar, A.C., Bohez, E.L.J., Singh, M., Lin, T., and Makhanov, S.S., “Computer Aided Geometric Modeling and 5-Axis Milling of a Screw Propeller in a Single Setup: A Case Study,” Proceeding of the 19th International Conference of Production Research (ICPR19), Chili, July 2007

 

14.  Rianmora, S., Koomsap, P., and Van Hai, D.P., “A Concept of Adaptive Reverse Engineering and its Application for Automotive Part Design,” Third National Conference on Automotive Engineering, Bangkok, Thailand, 2007

 

15.  Tuong, N. L., Koomsap, P., and Soonanon, P., “Preliminary Study on Driver Response for Driver Based Collision Avoidance System,” Third National Conference on Automotive Engineering, Bangkok, Thailand, 2007

 

16.  Risdiyono, and Koomsap, P., “Toward a Design by Customers for Automotive Accessories,” Third National Conference on Automotive Engineering, Bangkok, Thailand, 2007

 

17.  Soonanon, P., Koomsap, P., and Chansri, N., “Identifying Contour(s) for Layer-Base Geometrical Reconstruction,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

18.  Tangwarodomnukun, V., Koomsap, P., Opaprakasit, P., and Phattanaphibul, T., “Coloring Polylactide Powder for Multicolor Rapid Prototyping,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007

 

19.  Phattanaphibul, T., Opaprakasit, P., Koomsap, P., and Tangwarodomnukun, V., “Preparation of Biodegradable PLA for Powder-Based Rapid Prototyping,” the 8th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2007), Kaohsiung, Taiwan, December 2007