voratas

Dr. Voratas Kachitvichyanukul

Professor
Industrial & Manufacturing Engineering 

P.O. Box 4, Klong Luang 

Pathumthani Thailand 12120 

Phone: (662) 524-6135;

Fax: (662) 524-5697 

E-mail:Voratas@ait.ac.th
Personal Website

 


EDUCATION

·         Ph.D., Industrial Engineering, Purdue University, USA, 1982
·         M. Eng., Industrial Engineering and Management, Asian Institute of Technology, Thailand, 1976
·         B.S., Chemical Engineering, National Taiwan University, Taiwan, 1975

RESEARCH INTERESTS

·         Modeling and simulation of large scale industrial systems

·         Development of evolutionary solution methods for large-scale mathematical models of industrial systems

·         Decision support system for manufacturing enterprises

·         High performance computing

SELECTED PUBLICATIONS

·         Wisittipanich, W., and Kachitvichyanukul, V., (2011). “Two enhanced differential evolution algorithms for job shop scheduling problems,” International Journal of Production Research, (in press).

·         Kasemset, C. and Kachitvichyanukul, V., (2011). “A PSO Based Procedure for a Bi-level Multi-objective TOC-based Job-Shop Scheduling Problem,” International Journal of Operational Research, (in press)

·         Sooksaksun, N., Kachitvichyanukul, V., and Gong, D.C., (2011). “A Class-Based Storage Warehouse Design using a Particle Swarm Optimization Algorithm,” International Journal of Operational Research, (in press)

·         Kachitvichyanukul, V. and Sitthitham, S., (2011). “A Two-Stage Genetic Algorithm for Multi-objective Job Shop Scheduling Problems,” Journal of Intelligent Manufacturing, Volume 22, Issue 3, pp. 355-365. DOI: 10.1007/s10845-009-0294-6.

·         Pratchayaborirak, T. and Kachitvichyanukul, V., (2011). “A Two-Stage PSO Algorithm for Job Shop Scheduling Problem,” International Journal of Management Science and Engineering Management, Vol. 6, No.2, pp. 84-93.

·         Udomsakdigool, A. and Kachitvichyanukul, V., (2011). “Ant Colony Algorithm for Multi-criteria Job Shop Scheduling to Minimize Makespan, Mean Flow Time and Mean Tardiness,” International Journal of Management Science and Engineering Management, Vol. 6, No.2, pp. 117-123.

·         Sombuntham, P. and Kachitvichyanukul, V., (2011). “Multi-depot Vehicle Routing problem with Pickup and Delivery Requests,” IAENG Transactions on Engineering Technologies Volume 5, America Institute of Physics

·         Sooksaksun, N., Kachitvichyanukul, V., and Gong, D.C., (2010). “Performance Comparison of Different Warehouse Layouts under a Class-based Storage Policy,” International Journal of Logistics and SCM Systems, Vol. 10, No. 1, pp. 141-148.

·         Nguyen, S. and Kachitvichyanukul, V., (2010). “Movement strategies for multi-objective Particle Swarm Optimization,” International Journal of Applied Metaheuristic Computing, 1(3), 59-79.

·         Kasemset, C. and Kachitvichyanukul, V., (2010). “Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints,” International Journal of Production Research, Volume 48 Issue 20, pp. 6137–6154.  DOI: 10.1080/00207540903176705.

·         Kachitvichyanukul, V. and Sitthitham, S., (2009). “A Two-Stage Genetic Algorithm for Multi-objective Job Shop Scheduling Problems, Journal of Intelligent Manufacturing, DOI: 10.1007/s10845-009-0294-6.

·         Naowapadiwat, W., Gong, D.C., and Kachitvichyanukul, V., (2009). “Recent Trends in Research on Collaborative, Planning, Forecasting, and Replenishment,” International Journal of Logistics and SCM Systems, Vol. 3, No. 1, pp. 64-71.

·         Ai, T. J., and Kachitvichyanukul, V., (2009). “A Particle Swarm Optimization for the Heterogeneous Fleet Vehicle Routing Problem,” International Journal of Logistics and SCM Systems, Vol. 3, No. 1, pp. 32-39.

·         Ai, T. J., and Kachitvichyanukul, V., (2009). “A Particle Swarm Optimization for Vehicle Routing Problem with Time Windows,” International Journal of Operational Research, Vol 6, No.4, pp. 519-537.

·         Ai, T. J., and Kachitvichyanukul, V., (2009). “A particle swarm optimization for the vehicle routing problem with simultaneous pickup and delivery,” Computers & Operations Research, 36, pp. 1693-1702.

·         Ai, T. J., and Kachitvichyanukul, V., (2009). “Particle Swarm Optimization and Two Solution Representations for Solving the Capacitated Vehicle Routing Problem,” Computers & Industrial Engineering, Vol. 56, No. 1, pp. 380-387.

·         Pongchairerks, P. and Kachitvichyanukul, V., (2009). “A Particle Swarm Optimization Algorithm on Job-shop Scheduling Problems with Multi-purpose Machines,” Asia-Pacific Journal of Operational Research (APJOR), Vol. 26, No. 2, pp. 161-184. DOI: 10.1142/S0217595909002158.

·         Pongchairerks, P. and Kachitvichyanukul, V., (2009). “Particle Swarm Optimization Algorithm with Multiple Social Learning Structures,” International Journal of Operational Research, Vol. 6, No. 2, pp. 176-194.

·         Pongchairerks, P. and Kachitvichyanukul, V., (2009). “A Two-level Particle Swarm Optimization Algorithm on Job-shop Scheduling Problems,” International Journal of Operational Research, Vol. 4, No. 4, pp. 390- 411.

·         Udomsakdigool, A., and Kachitvichyanukul, V., (2008). “Multiple Colony Ant Algorithm for Job Shop Scheduling Problems”, International Journal of Production Research, Vol. 46, Issue 15, pp. 4155-4175.

·         Pongchairerks, P., and Kachitvichyanukul, V., (2007). “A Comparison between Algorithms VNS with PSO and VNS without PSO for Job-shop Scheduling Problems,” International Journal of Computational Science, Vol. 1, No. 2, pp.179-191.

·         Sirikum, J., Techanitisawad, A., and Kachitvichyanukul, V., (2007). “A New Efficient GA-Benders Decomposition Method: for Power Generation Expansion Planning with Emission Controls,  IEEE Transactions on Power Systems, Vol. 22, No. 3, pp. 1092-1100.

·         Ai, T.J., and Kachitvichyanukul, V., (2007). “A Particle Swarm Optimization for the Capacitated Vehicle Routing Problem,  International Journal of Logistic and SCM Systems, Vol. 2, No. 1, pp. 50-55.

·         Kachitvichyanukul, V., Purintrapiban, U. and Utayopas, P., (2005).Simulation and Modeling: Integrating Sciences and Technology for Effective Resource Management,” ISBN 974-8208-57-5, January 2005

·         Tantibadaro, V., and Kachitvichyanukul, V., (2003). On Comparing Performance of Multivariate Control Charts for Monitoring Autocorrelated Processes, International Journal of Industrial Engineering and Management Systems, Volume 2, Number 2.

·         Purintrapiban, U. and Kachitvichyanukul, V., (2003). Detecting Patterns in Process Data with Fractal Dimension, Computers and Industrial Engineering, Volume 45, Number 4, pp 653-667.